How to Compare Solar Panel Quotes
Solar proposals can describe different systems and use different assumptions about generation, household use, storage and exported electricity. Compare the equipment and work first, then read each forecast as a set of assumptions rather than a promise.
Compare the system design
Ask each installer to identify the panel make and model, number of panels, stated system capacity, inverter, mounting approach and any battery or monitoring equipment. Note which parts have been included, excluded or left as an allowance, and compare equipment specifications rather than relying on a single headline capacity.
Check the roof assumptions behind the design: usable area, orientation, pitch, shading, access and any survey still needed. Ask whether the proposal includes the full job, commissioning and handover. MCS advises comparing multiple quotes and checking whether the prices cover the complete work and commissioning.MCS
Inspect every forecast assumption
Ask for the estimated generation and the inputs used to produce it, including the roof details, system design, shading, losses and any battery assumptions. Keep predicted generation, the electricity you expect to use on site and the electricity you might export as separate figures.Energy Saving Trust
A forecast is an estimate for a particular design and set of assumptions, not a guaranteed output or bill saving. Ask the installer to explain a large difference between proposals before comparing their projected financial outcomes.MCS
Verify the installer and install scope
Check that the installer is currently certified for the relevant technology and confirm who will do the work if subcontractors are involved. MCS recommends checking certification as you obtain a quote, before signing and again before installation starts.MCS
Compare the site survey, mounting, electrical work, access equipment, scaffolding, protection, commissioning and handover documents. Ask who handles permissions, grid notifications or any required meter arrangements for your property; confirm requirements with the installer and relevant local or network body.MCS
Separate export terms from system performance
If a proposal includes payments for exported electricity, ask which tariff, eligibility conditions and export amount it assumes. Ofgem says SEG suppliers set their own rates, contract lengths and other terms, and advises generators to compare tariffs. Do not treat a quoted export rate as fixed for the life of the panels.Ofgem
The Smart Export Guarantee is a Great Britain scheme and you must apply to a supplier; Energy Saving Trust notes that signup is not automatic and eligibility conditions apply. Check current supplier terms for your circumstances, and seek separate guidance if you live in Northern Ireland.Energy Saving Trust
Compare a battery as a separate design and cost choice. Ask each installer to explain the capacity, usable amount, warranty, control assumptions and how storage changes the generation, self-use and export figures. Do not assume that adding a battery makes every forecast or tariff directly comparable.
Compare warranties and handover
Ask for the written terms for panels, inverter, battery and installation workmanship, including who provides each warranty and how a claim is made. Check exclusions, maintenance instructions, monitoring access and what documents you will receive after commissioning.
Record the final equipment list and any changes from the quote. The completed installation should be checked against the agreed design and handover documents; if something is missing or unclear, ask the installer to explain it before treating the comparison as complete.
This guide does not assess whether solar is suitable for a particular property or predict a financial return. Confirm technical details with an installer and check current export terms with the supplier before making a decision.
A practical recap
Solar quote comparison checklist
- Panel, inverter, mounting and battery specifications are named.
- Roof, shading, access and survey assumptions are visible.
- Generation, self-use, export and financial forecasts are kept separate.
- The installer’s current certification and any subcontractor roles are checked.
- Commissioning, grid or meter responsibilities, warranty providers and handover are clear.
- Any SEG tariff assumptions are verified against current supplier terms.
Illustrative example
Different battery assumptions change the comparison
Imagine Quote A includes a battery and models some evening use, while Quote B has no battery and assumes more electricity is exported. Their projected self-use and export values describe different system choices. Ask for the design and assumptions behind each figure; these invented examples are not performance predictions or savings evidence.
This example is illustrative only; it is not a supplier endorsement or a statement about typical prices.