All quote examples

Home improvement

Compare Solar Panel Installation Quotes

This quote comparison for solar panels, a battery and an inverter shows how equipment, installation, warranties and supplier-projected savings can differ from one quotation to the next. All figures and systems below are fictional, not performance or market guidance.

Entirely fictional example. These synthetic offers are not like-for-like; no winner or savings calculation is implied. “Not stated” does not mean excluded.

01 / BRIEF COMPARISON SUMMARY

B

Bright Field Solar

Quotation summary
Stated amount£8,900 including VATTax and scope details vary
M

Morrow Renewable Installers

Quotation summary
Stated amount£11,750 estimateTax and scope details vary
F

Fieldglass Energy

Quotation summary
Stated amount£7,980 plus VATTax and scope details vary

02 / comparison details

One criterion at a time.

Each stated value is supported by the synthetic excerpt shown for its supplier. “Not stated in this excerpt” describes only the excerpt, not the full document.

9 of 9 details
Synthetic supplier comparison for Home improvement
CriterionBright Field SolarGenerated summary · interpretation

The invented proposal lists ten panels, a 4.0 kWp system and a string inverter, with no battery. Its £640 annual bill-reduction figure is a supplier projection based on an assumed daytime-use pattern; the supporting consumption inputs are not attached. The offer remains valid for 14 days from the quotation date. Check the full assumptions, connection scope and separate workmanship warranty before comparing projections.

Morrow Renewable InstallersGenerated summary · interpretation

This fictional estimate lists a 12-panel, 4.8 kWp system with a hybrid inverter and 5 kWh battery. The supplier model projects £790 a year and 62% self-consumption using a customer-provided usage profile; these are not guaranteed outcomes. Roof repairs are excluded, while VAT, grid paperwork, export assumptions and battery warranty are not stated in the excerpt.

Fieldglass EnergyGenerated summary · interpretation

The fictional £7,980 amount is plus VAT and describes eight panels, 3.2 kWp and microinverters, with no battery. The excerpt gives an estimated annual generation figure but no projected bill saving. Roof survey, scaffold, export setup and warranty terms are still to be confirmed; ask what assumptions support the generation estimate and what costs remain outside the stated amount.

Price & tax
Stated amount£8,900£11,750 estimate£7,980
Tax basisIncluding VATNot stated in this excerptPlus VAT; VAT-inclusive total not given
Scope & specification
System specification10 panels; 4.0 kWp stated12 panels; 4.8 kWp stated8 panels; 3.2 kWp; estimated annual generation 2,850 kWh
Battery and inverterString inverter; battery not includedHybrid inverter and 5 kWh battery listedMicroinverters; no battery in this package
Projected savingsSupplier projection £640/year; assumptions not fully attachedSupplier model projects £790/year and 62% self-consumption using supplied profileNo projected bill saving provided
Assumptions and exclusionsDaytime-use assumption; detailed consumption inputs not attachedRoof repairs excluded; export assumptions not statedSeveral installation and price details remain to be confirmed
Work & responsibilities
Installation and connectionScaffold and standard electrical connection listedGrid paperwork and installation connection not statedRoof survey, scaffold and export setup to be confirmed
Timing & terms
Warranty termsPanel product warranty 15 years; workmanship terms not statedBattery warranty not stated; other warranty terms not statedProduct warranties and workmanship coverage to be confirmed
Offer validity
Validity period14 daysNot stated in this excerptNot stated in this excerpt

Bright Field Solar

The invented proposal lists ten panels, a 4.0 kWp system and a string inverter, with no battery. Its £640 annual bill-reduction figure is a supplier projection based on an assumed daytime-use pattern; the supporting consumption inputs are not attached. The offer remains valid for 14 days from the quotation date. Check the full assumptions, connection scope and separate workmanship warranty before comparing projections.

Morrow Renewable Installers

This fictional estimate lists a 12-panel, 4.8 kWp system with a hybrid inverter and 5 kWh battery. The supplier model projects £790 a year and 62% self-consumption using a customer-provided usage profile; these are not guaranteed outcomes. Roof repairs are excluded, while VAT, grid paperwork, export assumptions and battery warranty are not stated in the excerpt.

Price & tax

Stated amount

Bright Field Solar£8,900

Morrow Renewable Installers£11,750 estimate

Tax basis

Bright Field SolarIncluding VAT

Morrow Renewable InstallersNot stated in this excerpt

Scope & specification

System specification

Bright Field Solar10 panels; 4.0 kWp stated

Morrow Renewable Installers12 panels; 4.8 kWp stated

Battery and inverter

Bright Field SolarString inverter; battery not included

Morrow Renewable InstallersHybrid inverter and 5 kWh battery listed

Projected savings

Bright Field SolarSupplier projection £640/year; assumptions not fully attached

Morrow Renewable InstallersSupplier model projects £790/year and 62% self-consumption using supplied profile

Assumptions and exclusions

Bright Field SolarDaytime-use assumption; detailed consumption inputs not attached

Morrow Renewable InstallersRoof repairs excluded; export assumptions not stated

Work & responsibilities

Installation and connection

Bright Field SolarScaffold and standard electrical connection listed

Morrow Renewable InstallersGrid paperwork and installation connection not stated

Timing & terms

Warranty terms

Bright Field SolarPanel product warranty 15 years; workmanship terms not stated

Morrow Renewable InstallersBattery warranty not stated; other warranty terms not stated

Offer validity

Validity period

Bright Field Solar14 days

Morrow Renewable InstallersNot stated in this excerpt

03 / questions to ask

What to clarify next.

01

Bright Field Solar

  • What usage, tariff and export assumptions support the £640 projection?

  • What workmanship, inverter and installation warranties apply?

02

Morrow Renewable Installers

  • What VAT, grid paperwork and export assumptions should be included?

  • What battery warranty applies, and what assumptions support the projected bill reduction?

03

Fieldglass Energy

  • What is the VAT-inclusive total and what installation items remain extra?

  • What product, inverter and workmanship warranty terms apply?

04 / offer summaries

Three supplier proposals.

Fictional PDF · no registration required

Fictional report

Preview the PDF report

Open PDF in a new tab

If the PDF preview does not appear in your browser, open the PDF in a new tab above or download the fictional report.

Frequently Asked Questions

Which system details should I compare in solar quotes?

Compare the stated number and type of panels, system capacity, inverter and whether a battery is included. Check the installation scope and any product model details. Different system sizes or equipment should not be treated as equivalent just because the headline prices are close.

Can I compare solar quotes by projected savings?

Treat savings and generation figures as supplier projections, not guaranteed results. Ask what usage, roof, shading, tariff, export and equipment assumptions support each figure, and compare those assumptions as well as the system specifications.

What installation and connection work should I confirm?

Check whether the proposal describes the roof survey, scaffolding, electrical work, commissioning and any grid or export paperwork. Ask which items are included, which depend on a survey or approval, and what may be separately charged.

Which solar warranty and price terms should I review?

Check the VAT basis and ask for product, inverter, battery and workmanship warranty terms separately. Confirm any payment stages, the expected installation timing and what happens if the survey changes the proposed system or price.

Your documents stay private

Bring your own proposals into one review.