All examples

Home improvement

Three extension proposals. Read the assumptions.

An invented brief describes a single-storey rear extension of approximately 3 m × 4 m. The synthetic excerpts differ on drawings, groundworks, services, finishes, tax and waste, so the amounts are not normalized.

Entirely fictional example. These synthetic offers are not like-for-like; no winner or savings calculation is implied. “Not stated” does not mean excluded.

01 / offer summaries

Three supplier proposals.

Fictional PDF · no registration required

Fictional report

Preview the PDF report

Open PDF in a new tab

If the PDF preview does not appear in your browser, open the PDF in a new tab above or download the fictional report.

A

Alder Lane Build Co.

Quotation summary
Stated amount£44,800 excluding VATTax and scope details vary
N

North Harbour Extensions

Quotation summary
Stated amount£59,600Tax and scope details vary
W

Willow & Brick Works

Quotation summary
Stated amount£37,500 provisional estimateTax and scope details vary

02 / shared comparison

One criterion at a time.

Each stated value is supported by the synthetic excerpt shown for its supplier. “Not stated in this excerpt” describes only the excerpt, not the full document.

Synthetic supplier comparison for Home improvement
CriterionAlder Lane Build Co.Generated summary · interpretation

The £44,800 amount is stated excluding VAT and is based on drawings supplied by the customer. The excerpt includes foundations, shell, roof, two rooflights, sliding doors and first-fix services. Internal finishes, fees, waste handling, timing and payment stages are not stated. The excerpt does not establish a completed-extension total.

North Harbour ExtensionsGenerated summary · interpretation

The £59,600 fixed quote includes VAT and lists a measured survey, drawing coordination, an application-pack allowance, foundations, shell, roof, openings, first-fix services and plaster finish. Statutory fees, floor finish and decoration are excluded. The excerpt allows 14 weeks from an agreed start but does not state waste removal or payment stages.

Willow & Brick WorksGenerated summary · interpretation

The £37,500 is a provisional estimate for foundations, block shell and roof structure after a site visit. Glazing, services and internal finishes are expressly excluded; tax basis, design or application work, waste, schedule and payment stages are not stated. Ask what site assumptions support the estimate and how changes will be priced.

Stated amount£44,800£59,600£37,500 provisional estimate
Tax basisExcluding VATIncluding VATNot stated in this excerpt
Drawings / application paperworkBased on customer-supplied drawings; fees not statedMeasured survey, drawing coordination and application-pack allowance; statutory fees excludedNot stated in this excerpt
Groundworks / foundationsStrip foundations includedFoundations includedFoundations included; ground-condition assumptions not stated
Structure / roofBrick and block shell and roof covering includedInsulated block shell and roof includedBlock shell and roof structure only
Doors / rooflightsTwo rooflights and sliding doors includedSliding doors and two rooflights includedGlazing excluded
ServicesFirst-fix electrical and plumbing work includedFirst-fix electrical and plumbing includedServices excluded
Internal finishesNot stated in this excerptPlaster finish; floor finish and decoration excludedInternal finishes excluded
Waste / site clearanceNot stated in this excerptNot stated in this excerptNot stated in this excerpt
Schedule / paymentStart date and payment stages not stated in this excerptAllow 14 weeks from agreed start; payment stages not statedSchedule and payment stages not stated in this excerpt

Alder Lane Build Co.

The £44,800 amount is stated excluding VAT and is based on drawings supplied by the customer. The excerpt includes foundations, shell, roof, two rooflights, sliding doors and first-fix services. Internal finishes, fees, waste handling, timing and payment stages are not stated. The excerpt does not establish a completed-extension total.

North Harbour Extensions

The £59,600 fixed quote includes VAT and lists a measured survey, drawing coordination, an application-pack allowance, foundations, shell, roof, openings, first-fix services and plaster finish. Statutory fees, floor finish and decoration are excluded. The excerpt allows 14 weeks from an agreed start but does not state waste removal or payment stages.

Stated amount

Alder Lane Build Co.£44,800

North Harbour Extensions£59,600

Tax basis

Alder Lane Build Co.Excluding VAT

North Harbour ExtensionsIncluding VAT

Drawings / application paperwork

Alder Lane Build Co.Based on customer-supplied drawings; fees not stated

North Harbour ExtensionsMeasured survey, drawing coordination and application-pack allowance; statutory fees excluded

Groundworks / foundations

Alder Lane Build Co.Strip foundations included

North Harbour ExtensionsFoundations included

Structure / roof

Alder Lane Build Co.Brick and block shell and roof covering included

North Harbour ExtensionsInsulated block shell and roof included

Doors / rooflights

Alder Lane Build Co.Two rooflights and sliding doors included

North Harbour ExtensionsSliding doors and two rooflights included

Services

Alder Lane Build Co.First-fix electrical and plumbing work included

North Harbour ExtensionsFirst-fix electrical and plumbing included

Internal finishes

Alder Lane Build Co.Not stated in this excerpt

North Harbour ExtensionsPlaster finish; floor finish and decoration excluded

Waste / site clearance

Alder Lane Build Co.Not stated in this excerpt

North Harbour ExtensionsNot stated in this excerpt

Schedule / payment

Alder Lane Build Co.Start date and payment stages not stated in this excerpt

North Harbour ExtensionsAllow 14 weeks from agreed start; payment stages not stated

03 / open questions

What to clarify next.

01

Alder Lane Build Co.

  • What VAT, approval fees, internal finishes and waste arrangements apply?

  • What is the schedule and how are staged payments tied to completed work?

02

North Harbour Extensions

  • Which statutory fees and application steps sit outside the quoted amount?

  • What floor finish, waste removal and payment stages should be added to the scope?

03

Willow & Brick Works

  • Which ground conditions and dimensions are assumed in this provisional estimate?

  • What drawings, services, glazing, finishes, tax and waste costs remain to be scoped?

Your documents stay private

Bring your own proposals into one review.