Kitchen Renovation Quote Checklist: What to Confirm
A kitchen quote can combine products, preparation, fitting and specialist work in different ways. Compare each part against the same room plan and ask who is responsible for every connection, finish and open assumption.
Name the products and finish
Ask for the cabinet range, dimensions, fronts, handles, panels, internal fittings, worktop material and edge, sink, tap and appliance models to be named. If a product is still undecided, ask whether the amount is an allowance, what it covers and how substitutions affect the price.
A plan or schedule helps reveal whether the quotes use the same layout and quantities. Check end panels, fillers, plinths, trims, splashbacks, cut-outs, lighting and delivery separately; a general phrase such as “units included” may not settle those details.
Separate supply from fitting
List what the contractor supplies, what you buy, and what the fitting price covers. Confirm who measures, delivers, unloads and checks items; who removes old units and appliances; and whether floor or wall preparation, protection, plumbing reconnection, finishing and waste disposal are included.
Ask how the installer handles damaged, late or incompatible products. Record whether storage, return visits and replacement fitting are included or priced separately instead of assuming a single installation line covers them.
Clarify electrical work and approvals
Identify changes to sockets, lighting, appliances, circuits, gas, plumbing, ventilation or drainage. Ask which trade will do each item, who checks the work, and what certificates or completion records you should receive. Electrical Safety First advises using a suitably registered electrician and checking their registration and written scope.Electrical Safety First
The Planning Portal says refitting an existing kitchen with new units does not generally need building regulations approval, although associated drainage or electrical work may; a kitchen created in a room without one is likely to need approval. This is general guidance: ask the local building-control body about your specific property, proposed work and location.Planning Portal
Record assumptions before work starts
Ask how the quote treats uneven floors, damaged plaster, hidden pipework, moving services, structural changes and extra making good. Write down the rate or process for variations, who must approve them, and whether they change the completion date. Do not treat an unknown condition as an agreed extra or an included item.
Compare the stated start window, working days, payment stages, cleanup, handover, appliance manuals and product or workmanship warranties. The kitchen plan and the signed scope should match before you accept the job.Citizens Advice (England)
This checklist is not a building-control decision or an electrical design assessment. Confirm approvals and technical requirements for your property with the relevant local authority and qualified trades.
Review each quote as a room schedule
Make a small table with one row per product, trade or finishing task and one column per contractor. Mark each cell as included, excluded, allowance or not stated. This makes questions visible without turning unlike offers into a single adjusted total.
- Units, fronts, handles, panels and internal storage.
- Worktop, sink, tap, appliances, cut-outs and delivery.
- Removal, preparation, fitting, plumbing, electrical and ventilation work.
- Finishing, cleanup, waste, dates, payment stages and warranties.
A practical recap
Kitchen quote details to confirm
- Products, models, quantities and any allowances are identified.
- Supply, delivery, removal, installation and making good are separated.
- Each electrical, gas, plumbing and ventilation task has an assigned trade.
- Approval questions and completion documents are assigned to someone.
- Unknown conditions, variation approval, dates, payments and warranties are written down.
Illustrative example
The same cabinet count can hide different scope
Imagine two invented quotes both list eight base cabinets. One names the worktop, sink cut-out, removal and fitting; the other leaves those items open. The cabinet count alone does not make the totals comparable. Ask both contractors to confirm the products and work included in writing. No brands, prices or typical project outcomes are represented here.
This example is illustrative only; it is not a supplier endorsement or a statement about typical prices.